Our Projects

No.

PROJECT

CLIENT

START

FINISH

1

PREVISION OF WELL PAD CONSTRUCTION

ExxonMobil

2011

2014

2

PROVISION OF GENERAL CONSTRUCTION SERVICE (2 YEARS CONTRACT)

ROO (BP)

2012

2014

3

LSU DINING CABIN

ROO (BP)

2013

2014

4

EPC of QARMAT ALI WATER TREATMENT PLANT

ROO (BP)

2012

2014

5

PROVISION OF CONTROL OF WORK STATIONS

ROO (BP)

2012

2014

6

EPC OF MAYSAN ARMY LOCATION COMAND

SACE

2008

2010

7

PREVISION OF WELL PAD PREPARING at Al LIHASE FIELD

SOC

2009

2010

8

PREVISION OF WELL PAD CONSTRUCTION CONTRACT

ROO (BP)

2009

2010

9

PREVISION OF WELL PAD CONSTRUCTION CONTRACT

ROO (BP)

2010

2011

10

REFURBISHMENT OF DEGASSING STATION DS5

ROO (BP)

2009

2010

11

EPC OF FIELD LABOTARIES AT RUMAILA

ROO (BP)

2010

2010

12

CONSTRUCTION OF PIPE LINES ROADS IN NORTH RUMAILA

ROO (BP)

2010

2011

13

CONSTRUCTION OF BRC FOR ESP IN NR & SR

ROO (BP)

2011

2011

14

CONSTRCUTION OF MAIN ENTRANCE OF SOC HEADQUARTER IN BASRA

S.O.C

2009

2010

15

CONSTRUCTION OF WELL PAD CON- Iraq-10-0131

ROO (BP)

2009

2010

16

CONSTRUCTION OF 18 CLASSES SECONDARY SCHOOL

BASRA GOV.

2012

2014

17

CONSTRUCTION OF AL SUBACH DISTRICT INFRASTRUCTURES

BASRA GOV.

2010

2012

18

STORM WATER AND SEWAGE NETWORK FOR AL JAHEZA ACCOMMODATION IN ZUBAIR

BASRA GOV.

2010

2012

19

SHATT AL- ARAB PARK IN AL TANOMA

BASRA GOV.

2009

2010

20

SERVICE CONTRACT OF CLEANING WORKS IN AL ZUBAIR, SHUAIBA AND KHOR AL ZUBAIR

BASRA GOV.

2008

2009

21

REHABLITATION OF AL JUBAILA WATER TREATMENT PLANT

BASRA GOV.

2010

2011

22

CONSTRUCTION OF WATER PIPE LINE NETWORK IN BASRA PROVINCE CENTER

BASRA GOV.

2010

2011

23

CONSTRUCTION OF SERVICE ROAD FOR AL DAMAM PIPE LINE IN HAMMAR MUSHRIFH DEGASSING STATION

ZUBIR OPERATION

2009

2010

24

ENTRANCE ROAD OF QOLAAT SALEH 22 KM LONG

MAYSSAN GOV.

2009

2010

Other Projects

No.

PROJECT

CLIENT

START

-

 

1

SIPD –1484 ASP3 EARLY CIVIL WORKS

The Scope of Work covers the various
road works, earthworks & civils works
required for Well Pads G24, G28, F25
and MLB2. This may include, but is not
limited to access roads, site
development, internal roads, fencing,
drilling pits, in-situ and pre-cast
concrete works, trench works in and
around the Well pads in the Majnoon
Field as and when required by
COMPANY

 

Shell
Majnoon Field

 

2016

 

2

SIPD-1533 Civil and
Infrastructure
Maintenance and
Intervention Work

The Scope of Work include the civil
items to maintain, repair or modify
the existing facilities e.g. roads, well
pad preparation work, well pad
extensions or upgrading plant
facilities. This may include but not be
limited to road repair works, in-situ
and precast concrete work, pipelines,
and steel structures (e.g. platforms,
sun shades, fences and the like) in the
Majnoon Field .

Shell
Majnoon Field
2016
3

Master Agreement
General Construction
Service (GCC) CN101752

The scope of project included :
- Demolition
- Foundations and sub-structures
- Superstructures
- Mechanical, Electrical and
Plumbing including generator
installations
- Finishing Works
- Pre-fabricated offices,
accommodation units, ablution
blocks, workshops and life support
facilities
- Equipment skids
- Degassing station refurbishments
(laboratories, workshops, welfare
and Control of Work facilities)
- IT infrastructure (ducting,
manholes, containment)
- Security Control Points including
security gates and barriers
- Walling and Fencing (concrete T
walls, anti-climb fencing, chain link

ROO (BP)
Rumaila Field
2015
4

PREVISION OF CIVIL
WORKS FOR WELL PAD,
WORKOVER PADS AND
GENERATOR BASES #
CN101676 FOUNDATIONS, ASSEMBLY
AND FIT

The Work includes providing
construction Works with all related
Works to prepare the Well Pad to be
suitable for the purposes and
requirements of the Drilling Rig.
Including; but not limited to: Scraping
the natural ground, Leveling and
Grading, Backfilling with approved
filling materials for the Well Pad and
the access road(s), Concrete Work,
Construction of Water pit, Burning pit
& Sludge Pit and other required pits.

ROO (BP).
North & South
Rumaila
2014
5

OUT OF PREENGINEERED
METAL
BUILDINGS CN101698

The scope of project included:
- Transportation of caravans from
the manufacturer to the RSB Site .
- Installation the caravans offices of
sector 1 inside the RSB Site
(CONTRACTOR camp) .
- Supplying the materials (sub-base,
cement, sand, and gravel) .
- Excavation under the ground for
utilities and sewage .
- Full with soil and sub-base
materials and compacting.

ROO (BP).
North Rumaila
2014
6

Provision of Pipeline
Repair, Emergency System
(EPRS) CN101597

The scope of project included:
- Pipeline section replacement
- Welded steel sleeve
- Composite wrap
- Pin hole leak clamp
- Bolted clamp
- Temporary bypass

ROO (BP).
North Rumaila
2014
7

PREVISION OF WELL PAD
CONSTRUCTION #
CN101499

The Work includes Construction New
Well Pad and Generators Set
Foundation, Preparation for Work-
Over Work, Nitrogen Injection, and
Berm Removal

ROO (BP).
North & South
Rumaila
2014-2015  
8 PREVISION OF WELL PAD
CONSTRUCTION # CN
101324
ROO (BP).
North & South
Rumaila
   

 

 

No.

PROJECT

CLIENT

START

-

 

1

PREVISION OF WELL PAD CONSTRUCTION THREE YEARS CONTRACT

 

ROO (BP)

 

2013

 

 

2

CONSTRUCTION OF ONSHORE FACILITIES IN THE RUMAILA FIELD AND AT QARMAT ALI

 

ROO (BP)

 

2012

 

 

3

Pipeline Repair Emergency System CN101597

 

ROO (BP)

 

2014

 

 

4

Assembly and Fit Out of 7 Pre - Engineered Buildings

 

ROO (BP)

 

2014

 

 

5

Master Agreement General Construction Services

 

ROO (BP)

 

2014